Site logo
  • Home
  • About SEDA
    • Overview OF SEDA
    • Vision, Mission & Core Values
    • Authority Members
    • Management Team
    • Organizational Structure
    • Functions Of SEDA
    • Client Charter
    • SEDA’s Logo
    • RE Programmes
    • SEDA’s Occupational Safety & Health Policy and Energy Policy
    • SEDA Low Carbon Office
  • Policies
    • National Renewable Energy Policy
    • Legislation
      • Renewable Energy Act 2011
      • Sustainable Energy Development Authority Act 2011
    • Cyber ​​Security Policy
    • Other Related Fiscal Incentives
  • Directory
    • RE Industry Directory
      • RE Directory Listing Application
    • 2026 Registered PV Service Provider
      • Directory For RPVSP 2026
      • Application For RPVSP 2026
    • 2026 Registered Solar PV Investor (RPVI)
      • Directory For RPVI 2026
      • Application For RPVI 2026
    • Recognized Local Manufacturer/Assembler Listing
      • Solar PV Modules
      • Inverters for Solar PV Systems
      • Boilers
      • Gas Engines
      • Gasifier
    • Qualified Person
  • Media
    • News Insight
    • Notices & Announcements
    • Press Release
    • Photo Gallery
      • 2025
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020
      • 2019
      • 2018
      • 2017
      • 2016
      • 2015
      • 2014
      • 2013
      • 2012
      • 2011
  • Events
    • Events
    • Event Archive
    • Event Registration Form
    • Check Booking
    • Trainings
  • Download
    • Guidelines
      • Feed-In Tariff ( FiT ) Guidelines
      • Guidelines for Eligibility of the S02 Bonus
      • Solar ATAP Guidelines
      • NEM Guidelines
      • Power Systems Study Guideline
      • Guideline For Suruhanjaya Tenaga Licenses
      • TNB PV Interconnection
      • Procedure For The T&C Of GCPV
      • Biomass & Biogas Acceptance Test
      • Home owner’s guideline for Solar PV
      • Step-by-Step Guidelines
      • T&C of Small Hydro
    • Forms
      • FiT Application Form
      • ST ‘s License Form
      • Sample of Standardiz​ed REPPAs
      • Registered PV Service Provider Form
    • TNB Nodal Points
    • Presentation Materials
    • SEDA Annual Report
    • E-Magazine
    • E-Brochures
    • Archives
    • OACP
  • Misc
    • Contact Us
    • Procurement
      • Tender/Quotation
      • Notice
    • Enquiry / Feedback
    • Links
    • Job @ SEDA
    • FAQ
      • Net Metering (NEM) FAQ
      • Feed-In Tariff (FiT) FAQ
  • Malay
Online Systems
Mobile logo
Mobile logo

Search Results for 4

Procurement SEDA(SH)-24/2025 – Perkhidmatan Sewaan (Leasing) Kenderaan Elektrik SEDA Malaysia
30/12/2025

SEDA(SH)-24/2025 – Perkhidmatan Sewaan (Leasing) Kenderaan Elektrik SEDA Malaysia

Procurement SEDA(SH)-19/2025 – Pelantikan Firma Audit Bagi Pengauditan Pematuhan Pengurusan Pembayaran Mendapatkan Wang (RoM) dan Pengurusan Hasil Peruntukan Daripada Tarif Elektrik (AoT) di Sabah Electricity Sdn. Bhd. (SESB) Bagi Tahun 2024
22/10/2025

SEDA(SH)-19/2025 – Pelantikan Firma Audit Bagi Pengauditan Pematuhan Pengurusan Pembayaran Mendapatkan Wang (RoM) dan Pengurusan Hasil Peruntukan Daripada Tarif Elektrik (AoT) di Sabah Electricity Sdn. Bhd. (SESB) Bagi Tahun 2024

Procurement SEDA(SH)-14/2025 – Pelantikan Firma Audit Bagi Perkhidmatan Pengauditan Pematuhan Pengurusan Pembayaran Mendapatkan Wang (RoM) di Tenaga Nasional Berhad (TNB) Bagi Tahun 2023 dan 2024
19/08/2025

SEDA(SH)-14/2025 – Pelantikan Firma Audit Bagi Perkhidmatan Pengauditan Pematuhan Pengurusan Pembayaran Mendapatkan Wang (RoM) di Tenaga Nasional Berhad (TNB) Bagi Tahun 2023 dan 2024

Notice 2024
17/04/2025

Notice 2024

Procurement SEDA(SH)-04/2025: Perkhidmatan Kawalan Keselamatan Untuk Bangunan Pejabat SEDA Malaysia, Blok 3517, Jalan Teknokrat 5, Cyber 5, 63000 Cyberjaya, Selangor
12/02/2025

SEDA(SH)-04/2025: Perkhidmatan Kawalan Keselamatan Untuk Bangunan Pejabat SEDA Malaysia, Blok 3517, Jalan Teknokrat 5, Cyber 5, 63000 Cyberjaya, Selangor

Procurement SEDA(SH)-01/2025: Perkhidmatan Penyediaan Laporan Tahunan Kumpulan Wang SEDA Malaysia (KWSM) Dan Kumpulan Wang Tenaga Boleh Baharu (KWTBB) 2024 Bagi SEDA Malaysia
20/01/2025

SEDA(SH)-01/2025: Perkhidmatan Penyediaan Laporan Tahunan Kumpulan Wang SEDA Malaysia (KWSM) Dan Kumpulan Wang Tenaga Boleh Baharu (KWTBB) 2024 Bagi SEDA Malaysia

Procurement SEDA(T)-06/2024: KERJA-KERJA PENGUBAHSUAIAN DI BANGUNAN PEJABAT BAHARU SEDA MALAYSIA, BLOK 3517, JALAN TEKNOKRAT 5, CYBER 5, 63000 CYBERJAYA, SELANGOR DARUL EHSAN.
23/12/2024

SEDA(T)-06/2024: KERJA-KERJA PENGUBAHSUAIAN DI BANGUNAN PEJABAT BAHARU SEDA MALAYSIA, BLOK 3517, JALAN TEKNOKRAT 5, CYBER 5, 63000 CYBERJAYA, SELANGOR DARUL EHSAN.

Procurement Sebut Harga Pelantikan Syarikat Untuk Menyediakan Perkhidmatan Latihan dan Team Building SEDA Malaysia Tahun 2024
25/09/2024

Sebut Harga Pelantikan Syarikat Untuk Menyediakan Perkhidmatan Latihan dan Team Building SEDA Malaysia Tahun 2024

News SEDA Innovation Challenge 2024: Pioneering Sustainable Energy Solutions
05/09/2024

SEDA Innovation Challenge 2024: Pioneering Sustainable Energy Solutions

News ISES 2024: Bukti Malaysia serius laksana peralihan tenaga, capai sasaran sifar karbon 2050
05/09/2024

ISES 2024: Bukti Malaysia serius laksana peralihan tenaga, capai sasaran sifar karbon 2050

Prev
Next

Recent News Insight

  • MALAYSIA SHOWCASES COMMITMENT TO ACCELERATE ENERGY TRANSITION THROUGH GLOBAL LESSONS
    05/12/2025
  • ASEAN Energy Leader’s Golf Tournament
    19/08/2025
  • Govt maintains credit scheme for over 96,000 rooftop solar users
    02/07/2025
  • Rooftop solar take-up slows amid new power tariff uncertainty
    02/07/2025
  • SEDA appoints public service department DG as chairman
    02/07/2025

Search

…
div#stuning-header .dfd-stuning-header-bg-container {background-image: url(https://www.seda.gov.my/wp-content/uploads/2019/01/Bground_018.jpg);background-size: initial;background-position: center bottom;background-attachment: initial;background-repeat: no-repeat;}#stuning-header div.page-title-inner {min-height: 220px;}#main-content .dfd-content-wrap {margin: -10px;} #main-content .dfd-content-wrap > article {padding: 10px;}@media only screen and (min-width: 1101px) {#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars {padding: 0 20px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child {border-top: 20px solid transparent; border-bottom: 10px solid transparent;}#layout.dfd-portfolio-loop > .row.full-width #right-sidebar,#layout.dfd-gallery-loop > .row.full-width #right-sidebar {padding-top: 10px;padding-bottom: 10px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars .sort-panel,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars .sort-panel {margin-left: -20px;margin-right: -20px;}}#layout .dfd-content-wrap.layout-side-image,#layout > .row.full-width .dfd-content-wrap.layout-side-image {margin-left: 0;margin-right: 0;}