Request for Quotation (RFQ) - Development of Standard Operating Procedures for Implementation of the Feed-inTariff mechanism   14/05/2013
SEDA MALAYSIA Will Re-open Solar PV Quota for Non-Individual under 500kW Category at 12pm, 23rd May, 2013   09/05/2013
Slide Presentation for the Dialogue on Solar PV Application , FiT Application and FiA Profile Submission checklist were UPLOADED!   09/05/2013
Sebutharga Bil.06/2013 : Tawaran Sebut Harga Bagi Pencetakan Semula Buku Panduan Cekap Tenaga di Rumah (Versi Bahasa Malaysia dan Bahasa Inggeris)   06/05/2013
Important Notice to all Solar PV FiA applicants who submitted applications on 2nd April 2013   03/05/2013
 
1% charge not aimed at unwary clients   13/05/2013
Seda Malaysia Buka Semula Permohonan Kuota Solar Fotovolta   10/05/2013
Seda Malaysia Re-opens Solar PV Quota Applications   10/05/2013
Seda Malaysia Clarifies On One Pct Surcharge In Electricity Bills   03/05/2013
Seda not raising political funds   03/05/2013
 
Best view with resolution of 1024 x 768 (or higher) and supports Internet Explorer 8.0+ or Firefox 3.0+
 

FiT Rates for Biogas (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2013 2014
(i)
up to and including 4MW
0.3184 0.3168
(ii)
above 4MW and up to and including 10MW
0.2985 0.2970
(iii)
above 10MW and up to and including 30MW
0.2786 0.2772
(b) Bonus FiT rates having the following criteria (one or more) : 2013 2014
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199 +0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100 +0.0099
(iii)
use of landfill or sewage gas as fuel source
+0.0786 +0.0771
FiT Rates for Biomass (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2013 2014 2015
(i)
up to and including 10MW
0.3085 0.3069 0.3054
(ii)
above 10MW and up to and including 20MW
0.2886 0.2871 0.2857
(iii)
above 20MW and up to and including 30MW
0.2687 0.2673 0.2660
(b) Bonus FiT rates having the following criteria (one or more) : 2013 2014 2015
(i)
use of gasification technology
+0.0199 +0.0198 +0.0197
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100 +0.0099 +0.0099
(iii)
use of locally manufactured or assembled gasification technology
+0.0100 +0.0099 +0.0099
(iv)
use of municipal solid waste as fuel source
+0.0982 +0.0964 +0.0947
FiT Rates for Small Hydro (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2013 2014 2015
(i)
up to and including 10MW
0.2400 0.2400 0.2400
(ii)
above 10MW and up to and including 30MW
0.2300 0.2300 0.2300
FiT Rates for Solar PV (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2013 2014
(i)
up to and including 4kW
1.1316 1.0411
(ii)
above 4kW and up to and including 24kW
1.1040 1.0157
(iii)
above 24kW and up to and including 72kW
0.9440 0.7552
(iv)
above 72kW and up to and including 1MW
0.9120 0.7296
(v)
above 1MW and up to and including 10MW
0.7600 0.6080
(vi)
above 10MW and up to and including 30MW
0.6800 0.5440
(b) Bonus FiT rates having the following criteria (one or more) : 2013 2014
(i)
use as installation in buildings or building structures
+0.2392 +0.2201
(ii)
use as building materials
+0.2300 +0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300 +0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100 +0.0100




 
Copyright © 2013 SEDA Malaysia. All Rights Reserved.